Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Al Said ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Drake ( Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

22/09/1921 ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

373 ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Troon ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Midship Section Plan for Drake, 30th January 1922 1922 )

Glasgow ( Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Report on Electric Lighting Installation for Drake, 1st February 1922 1922 )

Ayr; Glasgow ( Steel Steamer Report for Drake, 17th February 1922 1922 )

London ( Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934 )

Ayr; Troon; Glasgow ( Report on Machinery for Drake, 16th February 1922 1922 )

Mombasa ( Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951 )

Zanzibar ( Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951 )

A vessel’s means of propulsion.

Propulsion

Steam ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934 )

undefined ( Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

The name of the port/place of destination given.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1922 ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Ailsa Shipbuilding & Engineering Co Ltd ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Ayr ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Screw Steamer ( Steel Steamer Report for Drake, 17th February 1922 1922 )

Cargo ( Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Longitudinal Section, Deck Plans & Hatches for Al Said, 8th August 1919 1919, Plan of Stern Post & Rudder for Drake, 8th August 1919 1919, Freeboard Verification Form for Steamers for Al Said, 21st December 1921 1921, Report on Boilers for Drake, 6th May 1921 1921, Steel Steamer Report for Drake, 17th February 1922 1922, Form for Vessels of 100 Tons & Upwards for Drake, 30th January 1922 1922, Report on Machinery for Drake, 16th February 1922 1922, Report on Electric Lighting Installation for Drake, 1st February 1922 1922, Midship Section Plan for Drake, 30th January 1922 1922, Plan of New Deck House & Deck Over No 3 Hatch for Drake, 1930 1930, Memo to the Chief Ship Surveyor regarding Drake, 23rd February 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Drake, 13th October 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 9th August 1934 1934, Letter from H Campbell, R & H Green & Silley Weir Ltd, to Lloyd\'s Register, London, regarding Drake, 8th August 1934 1934, Copy of letter from the Secretary of Lloyd\'s Register to R & H Green & Silley Weir Ltd, London, regarding Drake, 1st August 1934 1934, Memo for Drake, 1st August 1934 1934, Report of Survey for Repairs, &c for Drake, 3rd October 1934 1934, Plan of New Hatch Abaft Fore Mast for Drake, 7th August 1934 1934, Plan of New Coaling Ports for Drake, 7th August 1934 1934, Letter from O Ross Innes, to The Secretary, London, regarding Al Said, 15th January 1951 1951, Letter from W F Waddington, Port Officer, Port & Marine Department, Zanzibar, to Surveyor, Smith MacKenzie & Co Ltd, Mombasa, regarding Al Said, 11th January 1951 1951, Note regarding presumed breaking up of Al Said, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Recorded information related to a vessel’s movements.

The port in which a vessel is registered or permanently based.

Type and configuration of the engine(s) supplied for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.