Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Avona - 1890 ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
The process of transferring a vessel to water, but not necessarily her completion.
12/11/1890 ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Unique identifier for a given ship, it is assigned by a builder.
378 ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Is the steamer assisted by sail?
No ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Is machinery fitted at the aft of the vessel?
No ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Measurement from the extreme outboard point of starboard to the extreme outboard point of port.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
The listed port to which a given vessel belongs.
London ( Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Harrison ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
The name of the port/place of destination given.
Cardiff to load ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2965 ( Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
1933 ( Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
41.1 ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).
Inverted triple expansion ( Report on Machinery for Avona, 7 March 1891 1891 )
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom ( Report on Machinery for Avona, 7 March 1891 1891 )
The year in which a vessel’s construction is completed.
1890 ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Richardson, Duck & Co ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Location where a vessel’s survey was undertaken.
Stockton-on-Tees ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890 )
Sunderland ( Report of Ship Forgings for Avona, 11 November 1890 1890 )
Middlesbrough ( Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891 )
Stockton-on-Tees; Middlesbrough ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
West Hartlepool; Hartlepool ( Report on Machinery for Avona, 7 March 1891 1891 )
A vessel’s means of propulsion.
Steam ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Does the vessel possess an auxiliary power source?
No ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Is electric lighting fitted to the vessel?
No ( Profile of Avona, 29 July 1890 1890, Pumping arrangement for Avona, 26 September 1890 1890, Report of Ship Forgings for Avona, 11 November 1890 1890, Sketch of masts for Avona, 12 August 1890 1890, Sketch of Boiler Room Bulkhead for Avona, 8 September 1890 1890, Midship section for Avona, 24 July 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Avona, 9 March 1891 1891, Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Name of surveyor.
Hugh Cameron ( Report of Ship Forgings for Avona, 11 November 1890 1890 )
Jesse Williams; Robert Haig ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
J E Stoddart ( Report on Machinery for Avona, 7 March 1891 1891 )
Length of a ship along the summer load line from the vessel’s stem to the sternpost.
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom ( Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
The individual and/or organisation listed
Carlisle & Co ( Report of Iron or Steel Steamer for Avona, March 1891 1891, Report on Machinery for Avona, 7 March 1891 1891 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 steel pt awng deck subject to fbrd of S 9'1" to top of stationary deck line at pt awng dk; 1 dk (iron) 2 trs B & web frames & pt awng-dk (iron); +LMC 3/91; La & cp ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
+LMC 3/91 ( Report on Machinery for Avona, 7 March 1891 1891 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
2248 ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
306.8 ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
28.5 ( Report of Iron or Steel Steamer for Avona, March 1891 1891 )
Location of construction for a vessel’s engines.
Hartlepool ( Report on Machinery for Avona, 7 March 1891 1891 )
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.