Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The process of transferring a vessel to water, but not necessarily her completion.

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Contextual information related to the reasons of the vessel’s loss or disposal.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

Broad categories and subdivisions of vessels related to their purpose or function.

Predominant material(s) utilised in a vessel’s construction.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Newcastle; London ( Steel Steamer Report for Gaslight, 4th September 1920 1920 )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Direct Acting Surface Condensing Triple Expansion ( Form for Vessels of 100 Tons & Upwards for Gaslight, 18th August 1920 1920 )

Inverted Triple Expansion ( Report on Machinery for Gaslight, 16th August 1920 1920 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.