Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Hilary ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

17/04/1931 ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

975 ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Birkenhead ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930 )

Liverpool ( Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959 )

London ( Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959 )

Birkenhead; Liverpool ( Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Dalmuir; Glasgow ( Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931 )

Trinidad B W I ( Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937 )

Leeds; Birkenhead ( Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945 )

Glasgow ( Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948 )

Birkenhead; Glasgow ( Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946 )

Hebburn on Tyne ( Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948 )

Newcastle on Tyne ( Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948 )

Jarrow on Tyne; Newcastle on Tyne ( Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949 )

Sunderland ( Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950 )

Geneve ( Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956 )

London; Liverpool ( Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956 )

Antwerp ( Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956 )

A vessel’s means of propulsion.

Propulsion

Steam ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

undefined ( Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to British Iron & Steel Corp for Breaking up at Inverkeithing ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

The individual and/or organisation listed

Ship owner

The Booth Steam Ship Co Ltd ( Request for Special Survey for Hilary, 20th June 1930 1930, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959 )

Recorded information relating the specific cargo being conveyed.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

The year in which a vessel’s construction is completed.

Year of ship completion

1931 ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cammell Laird & Co Ltd ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Birkenhead ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Screw Steamer ( Request for Special Survey for Hilary, 20th June 1930 1930, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950 )

Passenger; Cargo ( Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Inverkeithing ( Half Midship Section Plan for Hilary, 16th April 1930 1930, Plan of Rudder & Stern Frame for Hilary, 16th April 1930 1930, Request for Special Survey for Hilary, 20th June 1930 1930, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 13th August 1931 1931, Copy of Letter from pro Secretary, to The Secretary, Liverpool, regarding Hilary, 12th August 1931 1931, Memo to the Chief Ship Surveyor regarding First Entry for Hilary, 12th August 1931 1931, Freeboard Verification Form for Steamers for Hilary, 1st June 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 11th August 1931 1931, Letter from D M Keith, Secretary to the Liverpool Committee, to A Scott, Esq, London, regarding Hilary, 10th August 1931 1931, Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Hilary, 12th August 1931 1931, Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 1932 1932, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 8th August 1942 1942, Consignment note from Deighton's Patent Flue & Tube Co Ltd, to Cammell Laird & Co Ltd, regarding materials for Hilary, 28th September 1945 1945, Letter from H D Soas, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 6th July 1946 1946, Plan of Proposed Oil Fuel Bunkers for Hilary, 14th June 1946 1946, Memo to the Chief Ship Surveyor regarding Periodical Special Survey (C) Reconversion to Trawler Equipment for Hilary, 18th October 1946 1946, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Copy of Certificate of Testing for Hilary, 27th April 1946 1946, Copy of Advice Note from Campbell Laird & Co Ltd to Birkenhead General Stores regarding derricks for Hilary, 27th February 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946, Plan of Oil Fuel Bunkers for Hilary, 13th May 1948 1948, Copy of Certificate of Inspection for Hilary, 30th November 1948 1948, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Copy of Certificate of Examination & Testing for Hilary, 4th October 1948 1948, Copy of Certificate of Inspection for Hilary, 21st October 1948 1948, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Hilary, 5th April 1949 1949, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Hilary, 7th April 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Plan of Forged Stern Frame for Hilary, 24th January 1950 1950, Memo to the Chief Ship Surveyor regarding Docking & Damage for Hilary, 25th April 1950 1950, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Ship Forgings Form for Hilary, 8th March 1950 1950, Ship Forgings Form for Hilary, 13th March 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Plan of Costa Propulsion Bulb for Hilary, 21st February 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey (D) Due 3,56 of Hilary, 16th May 1956 1956, Question & Answer Memo between London & Liverpool offices, regarding Hilary being Special Survey, 7th May 1956 1956, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 11th April 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 12th April 1956 1956, Copy of Telegram from Lloyd\'s Committee, London, to Lloyd\'s Register, Antwerp, regarding Hilary, 11th April 1956 1956, Copy of Letter from per The Surveyors, to The Surveyors, Liverpool, regarding Hilary, 7th April 1956 1956, Memo for Hilary, 26th January 1956 1956, Letter from J A van Lare, per The Surveyors, to The Secretary, London, regarding Hilary, 19th January 1956 1956, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, 5th March 1956 1956, Plan of Proposed Arrangement to Increase Length of No 2 Hatch for Hilary, 11th December 1957 1957, Memo to the Chief Ship Surveyor regarding Docking Alterations in Accordance with Approved Plans for Hilary, 9th December 1957 1957, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Hilary, 20th January 1958 1958, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Hilary, 29th September 1959 1959, Copy of Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 16th September 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Hilary, 31st July 1959 1959, Form of Postponed Surveys for Hilary, 31st July 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Hilary, 23rd July 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959, Copy of Freeboard Report for Hilary, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Hilary, Undated no date, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7700 ( Request for Special Survey for Hilary, 20th June 1930 1930, Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

7403 ( Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931, Form for Vessels of 100 Tons & Upwards for Hilary, 2nd July 1931 1931, Report on Electric Fittings for Hilary, 14th August 1931 1931, Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946 )

6184 ( Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931, Report on Boilers for Hilary, 5th August 1931 1931 )

7420 ( Report of Surveys for Freeboard for Hilary, 5th February 1932 1932, Copy of Certificate of Inspection for Hilary, 30th December 1948 1948, Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949, Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950, Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956, Copy of Certificate of Survey of Repairs for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Copy of Certificate of Survey of Part Boiler & Part Machinery for Hilary, 11th April 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Hilary, 19th November 1957 1957 )

7415 ( Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Copy of Certificate for Refrigerating Machinery for Hilary, 19th December 1937 1937, Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957, Copy of Certificate of Survey of Permanent Repairs for Hilary, 14th November 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Copy of Certificate of Survey of Repairs for Hilary, 5th February 1958 1958, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958 )

7392 ( Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959, Copy of Certificate of Survey of Part Machinery for Hilary, 22nd June 1959 1959, Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959 )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 8,31 with Freeboard; Lloyds A & CP; +LMC 8,31; CL FD; Elec Light ( Steel Steamer or Motorship Report for Hilary, 7th August 1931 1931 )

+LMC 8,31; CL FD; Elec Light ( Report on Steam Reciprocating Engine Machinery for Hilary, 5th August 1931 1931 )

Deferred ( Report on Steam Turbine Machinery for Hilary, 18th February 1931 1931 )

See Machinery Rpt ( Report on Boilers for Hilary, 5th August 1931 1931 )

Electric Light ( Report on Electric Fittings for Hilary, 14th August 1931 1931 )

+100A1 with Freeboard ( Report of Surveys for Freeboard for Hilary, 5th February 1932 1932 )

9,46 Bkn; SS Bkn 9,46; +LMC 9,46; TS 6,46 ( Report of Survey for Repairs, &c for Hilary, 20th September 1946 1946 )

+LMC 9,46; TS 6,46 ( Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 21st September 1946 1946 )

1,49 Nwc; S 12,48; BS 2,49; Fitted for Oil Fuel 2,49; FP Above 150 F ( Report of Survey for Repairs, &c for Hilary, 21st February 1949 1949 )

S 12,48; BS 2,49 ( Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 1st February 1949 1949 )

3,50 Liv (With Endorsement); BS 2,50 ( Report of Survey for Repairs, &c for Hilary, 8th April 1950 1950 )

BS 2,50 ( Report of Survey for Repairs, &c, of Engines & Boilers for Hilary, 30th March 1950 1950 )

See Liv 144387 but Assign 3,56 Ant; S 3,56; SPS 4,56 ( Report of Survey for Repairs, &c for Hilary, 25th April 1956 1956 )

See Liv 144387 but Assign S 3,56; SPS 4,56; Pmt Aft Main Ber Temporaly Out of use ( Report of Periodical Surveys & Repairs of Machinery for Hilary, 16th April 1956 1956 )

DS 10,57 with Endorsement ( Report of Ship Surveys & Repairs for Hilary, 14th November 1957 1957 )

+100A1 With Fbd 6,57; SS Ant (Dr) 4,56; +LMC 4,56; BS M 7,57; TS CL 3,56; SPS 4,56; OF 2,49 ( Report of Periodical Surveys & Repairs of Machinery for Hilary, 20th November 1957 1957, Report of Ship Surveys & Repairs for Hilary, 5th February 1958 1958 )

+100A1 with Freeboard 6,58; S S (Dr) 4,56; +LMC 4,56; BS M 6,59; SP 4,56; TS 3,56; CL ( Report of Total Loss, Casualty, &c for Hilary, 23rd September 1959 1959 )

Deferred for TS; MBS 6,59 ( Report of Periodical Surveys & Repairs of Machinery for Hilary, 23rd June 1959 1959 )

+100A1 With Freeboard Contemplated ( Report of Surveys for Freeboard-Steam Ships for Hilary, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Physical arrangement of a ship’s masts, sails and rigging.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.