Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The process of transferring a vessel to water, but not necessarily her completion.

Location where a vessel’s survey was undertaken.

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Compound Direct Acting Surface Condensing ( Report on Machinery for Kent, 7th July 1881 1881 )

The port in which a vessel is registered or permanently based.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

Predominant material(s) utilised in a vessel’s construction.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Is electric lighting fitted to the vessel?

Location of construction for a vessel’s engines.

Location of engine build

Sunderland ( Report on Machinery for Kent, 7th July 1881 1881 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.