Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Malancha ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
The process of transferring a vessel to water, but not necessarily her completion.
27/12/1917 ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Unique identifier for a given ship, it is assigned by a builder.
709 ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Location where a vessel’s survey was undertaken.
Glasgow ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918 )
Liverpool ( Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
Port Glasgow ( Longitudinal & Deck Plans for Malancha, 1916 1916, Half Midship Section Plan for Malancha, March 1918 1918 )
Greenock ( Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918 )
Port Glasgow; Glasgow; Greenock ( Steel Steamer Report for Malancha, 30th March 1918 1918 )
Port Glasgow; Greenock ( Report on Machinery for Malancha, 29th March 1918 1918 )
Calcutta ( Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932 )
A vessel’s means of propulsion.
Steam ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
undefined ( Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932 )
Is the steamer assisted by sail?
No ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for demolition ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
The listed port to which a given vessel belongs.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Elec Light ( Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918 )
+100A1 3,18; Lloyds A & CP; +LMC 3,18; Carrying Fuel Oil F P Above 150 DB DJ; Intermediate BHL in Tween Dk Dispensed With 7 BH to Uppor Dk 1BH to Dk Only ( Steel Steamer Report for Malancha, 30th March 1918 1918 )
+LMC 3,18; Carrying Oil fuel FP Above 150 in Double Deep Tank ( Report on Machinery for Malancha, 28th March 1918 1918 )
See Accompanying Machinery Report ( Report on Boilers for Malancha, 28th March 1918 1918 )
See Minute on Gls Rpt No 37654 ( Report on Machinery for Malancha, 29th March 1918 1918 )
BS 10,32 ( Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932 )
+100A1 5,33; Fitted for Oil Fuel 2,20 FP above 150F; SS Cal No 3-9,30; +LMC; MS 5,30; BS 10,32 ( Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk ( Steel Steamer Report for Malancha, 30th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918 )
Gls ( Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918 )
Cal ( Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
T J Legg ( Steel Steamer Report for Malancha, 30th March 1918 1918 )
Thomas George Legg ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
10572 ( Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
9822 ( Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
The port in which a vessel is registered or permanently based.
Liverpool ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Direct Acting Quadruple Expansion ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
Quadruple Expansion ( Report on Machinery for Malancha, 28th March 1918 1918 )
Date in which construction of a vessel’s engines were completed.
1918 ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932 )
The year in which a vessel’s construction is completed.
1918 ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Russell & Co ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Screw Steamer ( Steel Steamer Report for Malancha, 30th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918 )
Cargo ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Does the vessel possess an auxiliary power source?
No ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Is electric lighting fitted to the vessel?
No ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
The official record pronounced by the Committee
Broken up ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Recorded date for the vessel’s loss or disposal.
__/__/0000 ( Plan of Main Boiler for Malancha, July 1912 1912, Plan of Auxiliary Boiler for Malancha, July 1912 1912, Copy of a Letter from A B Hyles, General Manager, for Thomas & John Brocklebank Ltd, to G S Goodwin & Co, Liverpool, regarding Malancha, 17th June 1916 1916, Longitudinal & Deck Plans for Malancha, 1916 1916, Report on Electric Lighting Installation for Malanda, 22nd April 1918 1918, Memo for the Chief Ship Surveyor with their annotations regarding Malancha, 11th April 1918 1918, Letter from R Bennett, to The Secretary, London, regarding Malancha, 12th April 1918 1918, Copy of a Letter from Secretary, to The Surveyors, Greenock, regarding Malancha, 10th April 1918 1918, Steel Steamer Report for Malancha, 30th March 1918 1918, Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Half Midship Section Plan for Malancha, March 1918 1918, Certificate of Survey of Boilers for Malancha, 10th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932, Report of Total Loss, Casualty, &c for Malancha, 2nd January 1933 1933 )
Name of surveyor.
Recorded information relating the specific cargo being conveyed.
The individual and/or organisation listed
T & J Brocklebank Ltd ( Steel Steamer Report for Malancha, 30th March 1918 1918 )
Thomas & John Brocklebank Ltd ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
Brocklabank Ltd ( Report on Machinery for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918 )
Thomas & John Brocklibank Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932 )
Physical arrangement of a ship’s masts, sails and rigging.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JSQD ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Sir Aubrey Brocklebank Bart ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918 )
Location of construction for a vessel’s engines.
Glasgow ( Form for Vessels of 100 Tons & Upwards for Malancha, 18th March 1918 1918, Report on Machinery for Malancha, 28th March 1918 1918, Report on Boilers for Malancha, 28th March 1918 1918, Report on Machinery for Malancha, 29th March 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for Malancha, 10th October 1932 1932 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.