Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Archibald McMillan & Son ( Report of survey for Marys, 22 May 1846 1846 )
McMillan ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849, Annual Surveys Report for Marys, 21st August 1851 1851 )
The individual and/or organisation listed
Hector Henderson ( Report of survey for Marys, 22 May 1846 1846 )
John Campbell ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849, Annual Surveys Report for Marys, 21st August 1851 1851 )
Name of surveyor.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 5 years ( Report of survey for Marys, 22 May 1846 1846 )
5A1 Contd 2A1; Record repair ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849 )
Cont 2A1 ( Annual Surveys Report for Marys, 21st August 1851 1851 )
Broad categories and subdivisions of vessels related to their purpose or function.
A vessel’s means of propulsion.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
53 ( Report of survey for Marys, 22 May 1846 1846, Annual Surveys Report for Marys, 21st August 1851 1851 )
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The listed port to which a given vessel belongs.
Predominant material(s) utilised in a vessel’s construction.
Wood ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849, Annual Surveys Report for Marys, 21st August 1851 1851 )
The year in which a vessel’s construction is completed.
The port or place in which the vessel’s construction took place, at the time of writing.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
Kelvin Dock; Clyde Ports ( Report of survey for Marys, 22 May 1846 1846 )
Bowling; Glasgow ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849 )
Dumbarton; Glasgow ( Annual Surveys Report for Marys, 21st August 1851 1851 )
The name of the port/place of destination given.
Lisbon ( Report of survey for Marys, 22 May 1846 1846 )
Coasting ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849 )
Coaster ( Annual Surveys Report for Marys, 21st August 1851 1851 )
Physical arrangement of a ship’s masts, sails and rigging.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report of survey for Marys, 22 May 1846 1846, Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849, Annual Surveys Report for Marys, 21st August 1851 1851 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849, Annual Surveys Report for Marys, 21st August 1851 1851 )
Recorded information related to a vessel’s movements.
Bowling; Coasting ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849 )
Dumbarton; Coaster ( Annual Surveys Report for Marys, 21st August 1851 1851 )
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
53 ( Report of Survey for Repairs; Continuation for Marys, 7th December 1849 1849 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.