Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Oscar ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
The process of transferring a vessel to water, but not necessarily her completion.
21/02/1891 ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Unique identifier for a given ship, it is assigned by a builder.
336 ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Is the steamer assisted by sail?
No ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Is machinery fitted at the aft of the vessel?
No ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Maximum length of a vessel’s hull measured parallel to the waterline.
Name of surveyor.
The country (flag) that a vessel is registered to, at the time of writing.
Trieste ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891 )
The individual and/or organisation listed
Giovanni G Gargurevich & Co ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 steel; 1 dk (iron) & web frames; well dk; +LMC 4/91; a & cp ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
+LMC 4/91 ( Report on machinery for Oscar, 2 March 1891 1891 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
989 ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
234 ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
16.2 ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
Location of construction for a vessel’s engines.
Sunderland ( Report on machinery for Oscar, 2 March 1891 1891 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1891 ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Raylton Dixon & Co ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Middlesbrough ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Location where a vessel’s survey was undertaken.
Middlesbrough ( Pumping Arrangement for Oscar, 10 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
Motherwell ( Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890 )
Sunderland ( Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891 )
A vessel’s means of propulsion.
Steam ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Does the vessel possess an auxiliary power source?
No ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Is electric lighting fitted to the vessel?
No ( Pumping Arrangement for Oscar, 10 November 1890 1890, Receipt from David Colville & Sons to Thomas Farnley Iron Co Ltd relating to the case of Oscar, 31 October 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 9 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 5 November 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 10 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 8 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 11 December 1890 1890, Receipt from The Wear Steel Co Ltd to North Eastern Marine Engineering Co relating to the case of Oscar, 29 November 1890 1890, Midship Section for Oscar, 22 September 1890 1890, Profile of Oscar, 22 September 1890 1890, Plan of boiler for Oscar, 11 October 1890 1890, Note relating to the case of Oscar, 2 April 1891 1891, Letter from J T Findlay, Surveyor at Sunderland, to the Secretary, Lloyd's Register, regarding the boiler of Oscar, 4 April 1891 1891, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891, Note of calcuations relating to boiler of Oscar no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section for Oscar, 22 September 1890 1890, Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
Measurement from the extreme outboard point of starboard to the extreme outboard point of port.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
The listed port to which a given vessel belongs.
Trieste ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1270 ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
818 ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891, Report on machinery for Oscar, 2 March 1891 1891 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
34.5 ( Report of Iron or Steel Steamer for Oscar, 2 April 1891 1891 )
Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).
Triple compound 3 cranks ( Report on machinery for Oscar, 2 March 1891 1891 )
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom ( Report on machinery for Oscar, 2 March 1891 1891 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.