Slieve Donard ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/10/1921 ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

591 ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Barrow in Furness ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Steel Steamer Report for Slieve Donard, December 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922 )

Barrow ( Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921 )

Dublin ( Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921 )

Annan; Glasgow ( Report on Boilers for Slieve Donard, 16th May 1921 1921 )

London ( Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Liverpool ( Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924 )

Holyhead ( Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924 )

A vessel’s means of propulsion.

Propulsion

Steam ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924 )

undefined ( Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The port in which a vessel is registered or permanently based.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion Direct Acting Vertical Inverted Cylinder Reciprocating ( Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921 )

Twin Screw Four Cylinder Triple Expansion ( Report on Machinery for Slieve Donard, 18th January 1922 1922 )

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1921 ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Vickers Ltd ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Barrow in Furness ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920 )

Twin Screw Steamer ( Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Memo regarding classification for Slieve Donard, 6th March 1924 1924 )

undefined ( Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Passenger; Cargo ( Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Profile & Deck Plans for Slieve Donard, 14th July 1920 1920, Half Midship Section Plan for Slieve Donard, 14th July 1920 1920, Plan of Rudder & Stern Frame for Slieve Donard, 24th August 1920 1920, Freeboard Verification Form for Steamers for Slieve Donard, 1st December 1921 1921, Steel Steamer Report for Slieve Donard, December 1921 1921, Form for Vessels of 100 Tons & Upwards for Slieve Donard, 16th December 1921 1921, Report on Boilers for Slieve Donard, 16th May 1921 1921, Letter from Thomas S Shute, to The Secretary, London, regarding Slieve Donard, 4th February 1922 1922, Copy of Letter from Assistant to the Secretary, to The Secretary, Glasgow, regarding Slieve Donard, 3rd February 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slieve Donard, 31st January 1922 1922, Report on Machinery for Slieve Donard, 18th January 1922 1922, Report on Electric Lighting Installation for Slieve Donard, 23rd January 1922 1922, Copy of Letter from Assistant to the Secretary, to W J Nash, Marine & Dock Superintendent, Holyhead, regarding Slieve Donard, 6th March 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 6th March 1924 1924, Memo regarding classification for Slieve Donard, 6th March 1924 1924, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Screw Shaft for Slieve Donard, 27th February 1924 1924, Letter from L R Hatton, to A Scott Esq, London, regarding Slieve Donard, 22nd February 1924 1924, Letter from for W J Nash, to The Secretary, Lloyd\'s Register of Shipping, Liverpool, regarding Slieve Donard, 21st February 1924 1924, Copy of Letter from Assistant to the Secretary, to The Secretary, Liverpool, regarding Slieve Donard, 18th February 1924 1924, Report of Survey for Repairs, &c for Slieve Donard, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.