Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/12/1892
The year in which a vessel’s construction is completed.
1868
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Walter Hood & Co
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
The country (flag) that a vessel is registered to, at the time of writing.
Canada
The individual and/or organisation listed
Mount Royal Milling & Manufacturing Co
Location where the document is written.
Victoria, British Columbia
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Type of fuel used onboard a vessel.
Sail - Rigs
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Thermopylae - 1868
The process of transferring a vessel to water, but not necessarily her completion.
19/08/1868
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
The listed port to which a given vessel belongs.
Montreal
Name of the individual/entity/organisation responsible for authoring the record
Hall Ross & Co
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo
A vessel’s means of propulsion.
Sail
Predominant material(s) utilised in a vessel’s construction.
Composite (iron and wood)
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
991
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.