Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/05/1927
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cammell, Laird & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Birkenhead
A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).
149837
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger
Type of fuel used onboard a vessel.
Steam - Oil
Is the steamer assisted by sail?
No
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
7817
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
68.3
Physical extent of a record.
1
Name of ship as recorded on the record
Arandora - 1927
The process of transferring a vessel to water, but not necessarily her completion.
01/02/1928
Unique identifier for a given ship, it is assigned by a builder.
921
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons and upwards
The listed port to which a given vessel belongs.
London
The individual and/or organisation listed
Blue Star Line Ltd
A vessel’s means of propulsion.
Steam
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
12837
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
512.2
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
34.05
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.