Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/03/1929
The year in which a vessel’s construction is completed.
1929
Unique identifier for a given ship, it is assigned by a builder.
519
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
Glasgow 48950
Other/additional record(s) specifically mentioned, referenced or associated to another record.
London 93330
The listed port to which a given vessel belongs.
Glasgow
The date of first visit by a surveyor.
10/01/1929
The individual and/or organisation listed
Peninsular & Oriental Steam Navigation Co
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
03/12/1929
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger Liner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
19648
Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).
High pressure curtis impulse
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom
British Thomson Houston Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Viceroy of India
The process of transferring a vessel to water, but not necessarily her completion.
09/03/1929
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4a Report on Steam Turbine Machinery
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
03/04/1929
Name of the individual/entity/organisation responsible for authoring the record
W Lane; J D Macdonald
Name of surveyor.
Wilfred Lane; J D Macdonald
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 3,29
Recorded information related to a vessel’s movements.
Glasgow
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
10069
Location of construction for a vessel’s engines.
Rugby
Date in which construction of a vessel’s engines were completed.
1929
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.