Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
17/01/1945
The year in which a vessel’s construction is completed.
1945
Unique identifier for a given ship, it is assigned by a builder.
207
The country in which the vessel’s construction took place, at the time of writing.
Canada
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
947
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Montreal 6709
The date of first visit by a surveyor.
10/06/1946
Name of the individual/entity/organisation responsible for authoring the record
R Rodger
Name of surveyor.
Robert Rodger
Date of the meeting of the Classing Committee.
12/09/1946
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
L.S.T. 3519 - 1945
The process of transferring a vessel to water, but not necessarily her completion.
04/08/1946
The port or place in which the vessel’s construction took place, at the time of writing.
Montreal, Quebec
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cgo
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c Report on Oil Engine Electric Generator Sets
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
01/04/1945
Location where the document is written.
Beloit, Wisconsin
Location where a vessel’s survey was undertaken.
Beloit, Wisconsin
Broad categories and subdivisions of vessels related to their purpose or function.
Landing Ship, Tank
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.