Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

22/09/1842

The year in which a vessel’s construction is completed.

Year of ship completion

1842

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

T D Marshall

The country in which the vessel’s construction took place, at the time of writing.

Country of build

United Kingdom

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

1945

The country (flag) that a vessel is registered to, at the time of writing.

Country of registration

United Kingdom

The individual and/or organisation listed

Ship owner

Bedlington Coal Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

Matthew Poppelwell

Recorded information related to a vessel’s movements.

Voyage information

Newcastle upon Tyne

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo

Type of fuel used onboard a vessel.

Fuel

Steam - Coal

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Bedlington

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

24/03/1842

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

South Shields

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Shl

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

No title

The listed port to which a given vessel belongs.

Port belonging to

North Shields

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

William Wales

Location where a vessel’s survey was undertaken.

Location of Survey

South Shields

The name of the port/place of destination given.

Destined voyage

Blyth; River Tyne

A vessel’s means of propulsion.

Propulsion

Steam

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

214

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.