Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/02/1922
The year in which a vessel’s construction is completed.
1922
Unique identifier for a given ship, it is assigned by a builder.
611
The port or place in which the vessel’s construction took place, at the time of writing.
Dalmuir
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5 Report on Boilers
The listed port to which a given vessel belongs.
Genoa
The date of first visit by a surveyor.
09/04/1920
The individual and/or organisation listed
Lloyd Sabaudo Societa Anon per Agioni
Location where the document is written.
Dalmuir
Location where a vessel’s survey was undertaken.
Dalmuir
Date of the meeting of the Classing Committee.
02/04/1924
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom
William Beardmore & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Conte Rosso
The process of transferring a vessel to water, but not necessarily her completion.
02/10/1921
The name of the yard where the vessel was built.
Naval Construction Works
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
Glasgow 41720
The country (flag) that a vessel is registered to, at the time of writing.
Italy
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
02/01/1923
Name of the individual/entity/organisation responsible for authoring the record
A McKeand
Name of surveyor.
A McKeand
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See attached report
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger Liner
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Dalmuir
Date in which construction of a vessel’s engines were completed.
1922
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.