Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/01/1954
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Dublin Dockyard Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Dublin
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C. 11 (Contd.) - Alterations to Conditions of Assi
The listed port to which a given vessel belongs.
undefined
Name of the individual/entity/organisation responsible for authoring the record
John R Wright
Location where a vessel’s survey was undertaken.
Liverpool
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking Up
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Name of ship as recorded on the record
Caldyfield
The process of transferring a vessel to water, but not necessarily her completion.
27/11/1920
Unique identifier for a given ship, it is assigned by a builder.
105
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv
The port in which a vessel is registered or permanently based.
Liverpool
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Liverpool
A vessel’s means of propulsion.
undefined
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Briton Ferry
Recorded date for the vessel’s loss or disposal.
__/__/0000
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.