Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/02/1919
The year in which a vessel’s construction is completed.
1919
The process of transferring a vessel to water, but not necessarily her completion.
27/03/1919
Unique identifier for a given ship, it is assigned by a builder.
134
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Order
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
//
Location where the document is written.
Hamburg; Essen
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking Up; Demolition Commenced
Recorded date for the vessel’s loss or disposal.
//
Pertinent, useful or interesting recorded content.
Document is in German language & will require translation; Document refers to many other vessels related to Ellwiron
Name of ship as recorded on the record
Ellwiron
The laying of the keel is the formal recognition of the start of a vessel’s construction.
//
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Kockums Mek Verkstads A B
The port or place in which the vessel’s construction took place, at the time of writing.
Malmo
The country (flag) that a vessel is registered to, as it is written.
Germany
The date of first visit by a surveyor.
//
Name of the individual/entity/organisation responsible for authoring the record
Firma Ed Weber; Firma Fried Krupp A-G; Bureau Veritas Internationales Register
Date of the meeting of the Classing Committee.
//
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Hendrik Ido Ambacht
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.