Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
05/11/1920
The year in which a vessel’s construction is completed.
1920
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hawthorn & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Leith
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
15864
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
05/11/1920
Name of the individual/entity/organisation responsible for authoring the record
C Martell; J R Williamson
Name of surveyor.
J R Williamson
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 11,20
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Leith
Hawthorns & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to British Iron & Steel Corp for Breaking up
Name of ship as recorded on the record
Lanrick
The process of transferring a vessel to water, but not necessarily her completion.
18/06/1920
Unique identifier for a given ship, it is assigned by a builder.
177
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lth
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
The date of first visit by a surveyor.
28/06/1919
The individual and/or organisation listed
George Gibson & Co Ltd
Location where the document is written.
Leith
Location where a vessel’s survey was undertaken.
Leith
Date of the meeting of the Classing Committee.
26/11/1920
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Triple Inverted
Date in which construction of a vessel’s engines were completed.
1920
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.