Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/10/1942
The year in which a vessel’s construction is completed.
1912
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5787
The port in which a vessel is registered or permanently based.
Liverpool
The date of first visit by a surveyor.
19/03/1942
The individual and/or organisation listed
British & Irish Steam Packet Co Ltd
Location where the document is written.
Dublin
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Belfast
Harland & Wolff Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up
Name of ship as recorded on the record
Lady Connaught
The process of transferring a vessel to water, but not necessarily her completion.
07/09/1911
Unique identifier for a given ship, it is assigned by a builder.
424
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Dub
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
20/10/1942
Name of the individual/entity/organisation responsible for authoring the record
R B Grier
Location where a vessel’s survey was undertaken.
Dublin
Date of the meeting of the Classing Committee.
20/11/1942
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2284
Date in which construction of a vessel’s engines were completed.
1912
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
4
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.