Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/01/1962
The year in which a vessel’s construction is completed.
1954
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
N V Scheepswerven Gebr van Diepen
The port or place in which the vessel’s construction took place, at the time of writing.
Waterhuizen
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Liverpool
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Foundered
Vessel’s place of loss or disposal/last known recorded location.
Lat 50 31N Long 0 34W
Recorded date for the vessel’s loss or disposal.
11/01/1962
Name of ship as recorded on the record
Fordfield
The process of transferring a vessel to water, but not necessarily her completion.
09/01/1954
Unique identifier for a given ship, it is assigned by a builder.
928
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
Name of the individual/entity/organisation responsible for authoring the record
W A Savage Ltd
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Foundered in Heavy Weather & Total Loss
Vessel’s area of loss or disposal/last known recorded location.
English Channel
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?