Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/12/1958
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Craig Taylor & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Gothenburg 24537; Gothenburg 24538; Gothenburg 24539; Gothenburg 24543; Gothenburg 24547; Gothenburg 24548; Gothenburg 24557; Gothenburg 24559; Gothenburg 24571; Gothenburg 24572; Gothenburg 24535; Gothenburg 24536; Gothenburg 24460
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up
Pertinent, useful or interesting recorded content.
Also refers to vessels Olav Bakke & Benares
Name of ship as recorded on the record
Ella
The process of transferring a vessel to water, but not necessarily her completion.
12/08/1908
Unique identifier for a given ship, it is assigned by a builder.
131
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.