Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/04/1915
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Rennie Forrest Shipbuilding Engineering & Dry Dock Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Wivenhoe, Essex
Additional numbers that feature on a given record that may be used for identification.
Lloyd's
The date of first visit by a surveyor.
18/03/1915
Name of the individual/entity/organisation responsible for authoring the record
John B A Common
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
T & J Hosking
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Broken up
Pertinent, useful or interesting recorded content.
Engine Forgings No 1119; Manufactured by The Don Forge Co Ltd of Rotherham
Name of ship as recorded on the record
Lee Lee
The process of transferring a vessel to water, but not necessarily her completion.
09/12/1915
Unique identifier for a given ship, it is assigned by a builder.
1269
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
31/03/1915
Location where the document is written.
Sheffield
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
London
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.