Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
13/01/1936
The year in which a vessel’s construction is completed.
1937
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
N V C van der Giessen & Zonen Scheepswerven; Blyth Dry Docks & Shipbuilding Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
640
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Request for Special Survey
The individual and/or organisation listed
The Anglo Saxon Petroleum Co Ltd
Location where the document is written.
Krimpen A/D Yssel
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Werkspoor
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking Up
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Name of ship as recorded on the record
Erodona
The process of transferring a vessel to water, but not necessarily her completion.
27/11/1936
Name of the shipbuilder as it appears on the record.
Cvd Giessen for C van der Giessen & Zonen's Scheepswerven
The port or place in which the vessel’s construction took place, at the time of writing.
Krimpen aan den Yssel; Blyth
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Cvd Giessen for C van der Giessen & Zonen's Scheepswerven
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Amsterdam
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Rosyth
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.