Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/08/1941
The year in which a vessel’s construction is completed.
1940
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A S Burmeister & Wain
The port or place in which the vessel’s construction took place, at the time of writing.
Copenhagen
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 (Comp.) - Surveys for Freeboard
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
S Sandersen
Location where a vessel’s survey was undertaken.
Copenhagen
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
The country or national waters where a vessel is lost/disposed of, or last recorded.
Hong Kong
Physical extent of a record.
1
Name of ship as recorded on the record
Hoegh Rambler
The process of transferring a vessel to water, but not necessarily her completion.
20/12/1940
Unique identifier for a given ship, it is assigned by a builder.
650
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cpn
Additional numbers that feature on a given record that may be used for identification.
35893
The individual and/or organisation listed
Leif Hoegh & Co
Location where the document is written.
Copenhagen
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Petroleum in Bulk (Contemplated)
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
9428
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking Up at Hong Kong
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.