Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/05/1958
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barclay Curle & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 With Fbd Fitted for Carrying Oil 5/30 Fp Above 150F in Dt 7,57; SS Hpl (Dr) 11,53; +LMC 11,53; BS M 11,57; A 11;57; TS N 12,56; CL
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Brussels
Recorded information relating the specific cargo being conveyed.
oil
Name of ship as recorded on the record
City of Barcelona
The process of transferring a vessel to water, but not necessarily her completion.
12/02/1930
Unique identifier for a given ship, it is assigned by a builder.
636
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
14778
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Date of the meeting of the Classing Committee.
03/06/1958
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5844
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Scrappingco SPRL for Breaking up at Brussels
Recorded date for the vessel’s loss or disposal.
20/05/1958
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.