Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/11/1929
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Grangemouth Dockyard Co
The port or place in which the vessel’s construction took place, at the time of writing.
Grangemouth
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
49892
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
20/02/1929
The individual and/or organisation listed
Christmas Island Phosphate Co Ltd
Location where the document is written.
Glasgow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 11,29; CL; FD: Fitted for Oil Fuel 11,29 FP above 150F
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Newbury
Plenty & Sons Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Hong Kong Chiap Hua Manufactory Co Ltd for Breaking up at Hong Kong
Physical extent of a record.
1
Name of ship as recorded on the record
Islander
The process of transferring a vessel to water, but not necessarily her completion.
04/09/1929
Unique identifier for a given ship, it is assigned by a builder.
416
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
22/11/1929
Name of the individual/entity/organisation responsible for authoring the record
H L Sutherst
Location where a vessel’s survey was undertaken.
Grangemouth
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1619
Date in which construction of a vessel’s engines were completed.
1929
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
The country or national waters where a vessel is lost/disposed of, or last recorded.
Hong Kong
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.