Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/10/1927
The process of transferring a vessel to water, but not necessarily her completion.
23/01/1928
Unique identifier for a given ship, it is assigned by a builder.
210
Abbreviations of the names of ports with Lloyd’s Register survey offices.
N.Yk
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5 Report on Boilers
The date of first visit by a surveyor.
13/09/1927
The individual and/or organisation listed
International Petroleum Co
Location where the document is written.
New York
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Clv Rpt 412
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1927
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
The year in which a vessel’s construction is completed.
1928
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Marietta Manufacturing Co
The port or place in which the vessel’s construction took place, at the time of writing.
Point Pleasant, West Virginia
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
28143
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
30/09/1927
Name of the individual/entity/organisation responsible for authoring the record
John S Heck
Location where a vessel’s survey was undertaken.
Schenectady N Y
Date of the meeting of the Classing Committee.
09/05/1928
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Marietta O
Marietta Manufacturing Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.