Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/05/1963
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ferguson Bros (Port Glasgow) Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Plymouth
Recorded information related to a vessel’s movements.
Plymouth; Passage West County Cork
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Name of ship as recorded on the record
Discovery II
The process of transferring a vessel to water, but not necessarily her completion.
02/11/1929
Unique identifier for a given ship, it is assigned by a builder.
295
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Examination
Name of the individual/entity/organisation responsible for authoring the record
R E Pritchard
The name of the port/place from which a vessel’s voyage originated.
Plymouth
The name of the port/place of destination given.
Passage West County Cork
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1062
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.