Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/03/1944
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Broken Hill Proprietary Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Whyalla
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Thomas Aubrey
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4914
Location of construction for a vessel’s engines.
Kembla N S W
Australian Iron & Steel
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Kawasaki Dockyard Co Ltd for Breaking up, Demolition Commenced
Recorded date for the vessel’s loss or disposal.
31/01/1963
Name of ship as recorded on the record
River Glenelg
The process of transferring a vessel to water, but not necessarily her completion.
28/10/1943
Unique identifier for a given ship, it is assigned by a builder.
3
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
VMSJ
The port in which a vessel is registered or permanently based.
Port Adelaide
The individual and/or organisation listed
Commonwealth of Australia
Location where the document is written.
Port Adelaide
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion & Bauer W Exh Turbine
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Tsuneishi
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?