Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/06/1931
The year in which a vessel’s construction is completed.
1931
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vickers Armstrongs Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Barrow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
96620
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
11/06/1930
The individual and/or organisation listed
Peninsular & Oriental Steam Navigation Co Ltd
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
Rugby
Date of the meeting of the Classing Committee.
18/09/1931
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Turbo Electric
Date in which construction of a vessel’s engines were completed.
1931
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Hong Kong
Name of ship as recorded on the record
Strathnaver
The process of transferring a vessel to water, but not necessarily her completion.
05/02/1931
Unique identifier for a given ship, it is assigned by a builder.
663
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4a Report on Steam Turbine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
11/06/1931
Name of the individual/entity/organisation responsible for authoring the record
A Arthur A Chalmers; William Cowie
Name of surveyor.
William Cowie
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 9,31; 4 WT BCS; 2 Aux WT BCS; fitted for oil fuel 9,31 FP above 150f; DB 100lb; FD; CL
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
22547
Location of construction for a vessel’s engines.
Rugby
The British Thomson Houston Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Hong Kong
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.