Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
12/11/1943
The year in which a vessel’s construction is completed.
1944
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Clare Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Meteghan, Nova Scotia
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
853
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/10/1943
Location where the document is written.
Chicago Illinois
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See FE Machy Rpt
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Beloit Wisconsin
Fairbanks Morse & Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
M M S 1055
The process of transferring a vessel to water, but not necessarily her completion.
27/06/1944
Unique identifier for a given ship, it is assigned by a builder.
185
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cgo
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c Report on Oil Engine Electric Generator Sets
The date of first visit by a surveyor.
05/10/1943
Name of the individual/entity/organisation responsible for authoring the record
R Rodger; H W R Marks
Location where a vessel’s survey was undertaken.
Beloit Wisconsin
Date of the meeting of the Classing Committee.
09/02/1945
Predominant material(s) utilised in a vessel’s construction.
Wood
Type and configuration of the engine(s) supplied for a vessel.
Vertical Diesel
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.