Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Canadian Vickers Ltd
Unique identifier for a given ship, it is assigned by a builder.
108
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mtl
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Lighting Installation
The individual and/or organisation listed
Canadian Government
Location where the document is written.
Montreal
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Elec Light
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Fleurdelis
The process of transferring a vessel to water, but not necessarily her completion.
30/05/1929
Name of the shipbuilder as it appears on the record.
M Wardle
The port or place in which the vessel’s construction took place, at the time of writing.
Montreal
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3089
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
George Allan
Location where a vessel’s survey was undertaken.
Montreal
Date of the meeting of the Classing Committee.
06/09/1929
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.