Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/03/1925
The year in which a vessel’s construction is completed.
1925
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Tyne Iron Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle on Tyne
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Tyne Iron Ship Building Co Ltd
Broad categories and subdivisions of vessels related to their purpose or function.
Collier
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Wallsend
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Odense
Physical extent of a record.
1
Name of ship as recorded on the record
Redriff
The process of transferring a vessel to water, but not necessarily her completion.
09/05/1925
Unique identifier for a given ship, it is assigned by a builder.
229
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Request for Special Survey
The individual and/or organisation listed
South Metropolitan Gas Co
Location where the document is written.
London
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
North Eastern Marine Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to H I Hansen for Breaking up at Odense
Recorded information relating the specific cargo being conveyed.
Oil in Bulk
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.