Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/07/1922
The year in which a vessel’s construction is completed.
1920
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bethlehem Shipbuilding Corp
The name of the yard where the vessel was built.
Harlan Plant
Abbreviations of the names of ports with Lloyd’s Register survey offices.
N.Yk
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The individual and/or organisation listed
A H Bull & Co
Location where the document is written.
Newport News VA; New York
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See attached Rept N Ns 3610
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3482
Location of construction for a vessel’s engines.
Wilmington Del
Bethlehem Shipbuilding Corp Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded on reef, refloated & towed, Baught & Broken up by The national Salvage Co, at Jacksonville, Florida
Physical extent of a record.
1
Name of ship as recorded on the record
Ellenor
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1920
Unique identifier for a given ship, it is assigned by a builder.
3466
The port or place in which the vessel’s construction took place, at the time of writing.
Wilmington, Delaware
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
21931
The listed port to which a given vessel belongs.
Wilmington, De
The date of last visit by a surveyor.
26/07/1922
Name of the individual/entity/organisation responsible for authoring the record
C J Hudson; George Tully
Location where a vessel’s survey was undertaken.
Newport News VA; New York
Date of the meeting of the Classing Committee.
22/08/1922
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Reciprocating
Date in which construction of a vessel’s engines were completed.
1920
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Damaged by Stranding - now broken up
Vessel’s place of loss or disposal/last known recorded location.
Jacksonville Florida
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.