Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/03/1935
The year in which a vessel’s construction is completed.
1935
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vickers Armstrongs Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Barrow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
101283
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Barrow 2576
The date of first visit by a surveyor.
25/01/1935
The individual and/or organisation listed
Orient Steam Navigation Co Ltd
Location where the document is written.
London
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Brw FE 2576
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Heavy Oil Airless Injection (6827)
Date in which construction of a vessel’s engines were completed.
1935
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s area of loss or disposal/last known recorded location.
Tamise
Pertinent, useful or interesting recorded content.
Title of Document has been Altered
Name of ship as recorded on the record
Orion
The process of transferring a vessel to water, but not necessarily her completion.
07/12/1935
Unique identifier for a given ship, it is assigned by a builder.
697
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c Report on Oil Engine Electric Generator Sets
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
12/03/1935
Name of the individual/entity/organisation responsible for authoring the record
George A Laing
Location where a vessel’s survey was undertaken.
Bedford
Date of the meeting of the Classing Committee.
13/08/1935
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Bedford
W H Allen Sons & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Jos Boel & Sons for Breaking up at Tamise
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.