Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/02/1936
The year in which a vessel’s construction is completed.
1936
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Doxford & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
15604
Additional numbers that feature on a given record that may be used for identification.
Sunderland 31814
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
05/05/1936
Name of the individual/entity/organisation responsible for authoring the record
W H Fraser; P T Brown
Location where a vessel’s survey was undertaken.
Stockton
Date of the meeting of the Classing Committee.
19/05/1936
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Sunderland
William Doxford & Sons Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Leung Yau Shipbreaking Co for Breaking up at Hong Kong
Physical extent of a record.
1
Name of ship as recorded on the record
Peebles
The process of transferring a vessel to water, but not necessarily her completion.
24/03/1936
Unique identifier for a given ship, it is assigned by a builder.
625
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
The listed port to which a given vessel belongs.
Newcastle
The date of first visit by a surveyor.
27/11/1935
The individual and/or organisation listed
B J Sutherland & Co Ltd
Location where the document is written.
Middlesbrough
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute on FE Rpt
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4982
Date in which construction of a vessel’s engines were completed.
1936
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
The country or national waters where a vessel is lost/disposed of, or last recorded.
Hong Kong
Pertinent, useful or interesting recorded content.
Also refers to Vessel Caithness
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.