Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/06/1957
The year in which a vessel’s construction is completed.
1956
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
N V Scheepswerf Appingedam
The port or place in which the vessel’s construction took place, at the time of writing.
Appingedam
The port in which a vessel is registered or permanently based.
Groningen
The individual and/or organisation listed
N V Motorschip Irene
Name of the individual/entity/organisation responsible for authoring the record
T W Martin; A C Grover
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Foundered
Vessel’s place of loss or disposal/last known recorded location.
Hanstholm
Physical extent of a record.
1
Name of ship as recorded on the record
Rana
The process of transferring a vessel to water, but not necessarily her completion.
19/12/1956
Unique identifier for a given ship, it is assigned by a builder.
178
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Class
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Wijnne & Barends
Location where the document is written.
London
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
499
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sank
Recorded date for the vessel’s loss or disposal.
02/11/1962
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.