Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/06/1932
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan Hunter & Wigham Richardson Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Wallsend on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3817
Additional numbers that feature on a given record that may be used for identification.
33050
The individual and/or organisation listed
The Viking Whaling Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
George Webster
Location where a vessel’s survey was undertaken.
Sandefjord
Broad categories and subdivisions of vessels related to their purpose or function.
Tanker
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
12639
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
2
Name of ship as recorded on the record
Slava
The process of transferring a vessel to water, but not necessarily her completion.
06/07/1929
Unique identifier for a given ship, it is assigned by a builder.
1377
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sfj
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
S Cartwright
Location where the document is written.
Sandefjord
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 with Freeboard Whaling Service; Carrying Pet in Bulk; Fitted for Oil Fuel 9,29; Fp above 150 F
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.