Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/06/1915
The year in which a vessel’s construction is completed.
1914
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong Whitworth & Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
868
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
The listed port to which a given vessel belongs.
Charlottetown
The date of first visit by a surveyor.
27/01/1914
The individual and/or organisation listed
Canadian Government
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
W Manning
Location where the document is written.
Newcastle
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Train Ferry; Lloyds A & CP: +LMC 6,15; FD
Recorded information related to a vessel’s movements.
Walker on Tyne; Halifax
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Prince Edward Island
The process of transferring a vessel to water, but not necessarily her completion.
05/10/1914
Name of the shipbuilder as it appears on the record.
R Saxton White
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
67703
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 67056
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
23/06/1915
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Department of Railways & Canals
Name of the individual/entity/organisation responsible for authoring the record
T S Shute; A R Sneddon
Location where a vessel’s survey was undertaken.
Walker on Tyne
Date of the meeting of the Classing Committee.
06/07/1915
The name of the port/place of destination given.
Halifax
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2795
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.