Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/10/1926
The year in which a vessel’s construction is completed.
1926
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Societe des Ateliers et Chantiers de France
The port or place in which the vessel’s construction took place, at the time of writing.
Dunkirk
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2760
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
27/10/1926
Name of the individual/entity/organisation responsible for authoring the record
John Crighton
Location where a vessel’s survey was undertaken.
Dunkirk
Date of the meeting of the Classing Committee.
04/01/1927
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Diesel 6 S T 60
Date in which construction of a vessel’s engines were completed.
1925
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Theophile Gautier
The process of transferring a vessel to water, but not necessarily her completion.
26/06/1926
Unique identifier for a given ship, it is assigned by a builder.
132
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Dnk
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4b Report on Oil Engine Machinery
The date of first visit by a surveyor.
18/10/1924
The individual and/or organisation listed
Societe des Services Contractures des Messageries Maritimes
Location where the document is written.
Dunkirk
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 10,26 CL; Oil Engines
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8706
Location of construction for a vessel’s engines.
St Denis Seine
Cie de Constructions Mecaniques Proceeds Sulzer
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.