Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/07/1939
The year in which a vessel’s construction is completed.
1913
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Murdoch & Murray Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
24124
The port in which a vessel is registered or permanently based.
Ponte Delgada
The date of first visit by a surveyor.
12/06/1939
The individual and/or organisation listed
Cia de Navegacao Carregadores Acorianos
Location where the document is written.
Hamburg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
BS 5,39
Recorded information related to a vessel’s movements.
Hamburg; Portugal
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Glasgow
Muir & Houston Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Goncalo Velho
The process of transferring a vessel to water, but not necessarily her completion.
22/01/1913
Unique identifier for a given ship, it is assigned by a builder.
253
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ham
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
29/06/1939
Name of the individual/entity/organisation responsible for authoring the record
Friedrich C M Witt
Location where a vessel’s survey was undertaken.
Hamburg
Date of the meeting of the Classing Committee.
28/07/1939
The name of the port/place of destination given.
Portugal
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1595
Date in which construction of a vessel’s engines were completed.
1913
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.