Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/09/1921
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Dublin Shipbuilders Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Dublin
Additional numbers that feature on a given record that may be used for identification.
30177
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
William T Pyle
Location where a vessel’s survey was undertaken.
Dublin
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Holmdale
The process of transferring a vessel to water, but not necessarily her completion.
23/09/1921
Unique identifier for a given ship, it is assigned by a builder.
17
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
11b Surveys for Freeboard-Steam Ships
The port in which a vessel is registered or permanently based.
Glasgow
The individual and/or organisation listed
Henry Abram
Location where the document is written.
Dublin
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Class Contemplated
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Also refers to Vessel Craigavon
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.