Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/06/1950
The year in which a vessel’s construction is completed.
1951
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cammell Laird & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Birkenhead
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
75668
Additional numbers that feature on a given record that may be used for identification.
Liverpool 132467
The date of first visit by a surveyor.
15/04/1949
Name of the individual/entity/organisation responsible for authoring the record
A J Brown
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
27/02/1951
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Birkenhead
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
General San Martin
The process of transferring a vessel to water, but not necessarily her completion.
14/09/1950
Unique identifier for a given ship, it is assigned by a builder.
1203
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5c Report on Water Tube Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
09/06/1950
Location where the document is written.
Glasgow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute on Liverpool FE Mchy Rpt
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
12759
Cammell Laird & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.