Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

17/07/1924

The year in which a vessel’s construction is completed.

Year of ship completion

1924

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

James Robertson & Son Fleetwood Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Fleetwood

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

87143

The listed port to which a given vessel belongs.

Port belonging to

Fleetwood

The date of first visit by a surveyor.

Date of first survey

10/07/1924

The individual and/or organisation listed

Ship owner

The Fleetwood Urban District Council

Location where the document is written.

Location of Document Creation

Liverpool

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Electric Light

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Ferry

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Composite (iron & wood)

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

54

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Wyresdale

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

18/06/1924

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

H L Robertson

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Liv

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

13 Report on Electric Fittings

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

17/07/1924

Name of the individual/entity/organisation responsible for authoring the record

Document author

A Smellie

Location where a vessel’s survey was undertaken.

Location of Survey

Fleetwood

Date of the meeting of the Classing Committee.

Date of Classing committee

22/07/1924

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

2

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.