Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/03/1925
The year in which a vessel’s construction is completed.
1925
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J Crichton & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Saltney Chester
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
12301
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
27/03/1925
Location where the document is written.
Middlesbrough
Location where a vessel’s survey was undertaken.
Stockton on Tees
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Newbury
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Lurgurena
The process of transferring a vessel to water, but not necessarily her completion.
12/03/1925
Unique identifier for a given ship, it is assigned by a builder.
398
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
The date of first visit by a surveyor.
20/12/1924
Name of the individual/entity/organisation responsible for authoring the record
W H Roberts
Name of surveyor.
W H Roberts
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Machy Rpt
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Plenty & Sons Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?