Date recorded as the time of writing.

Date of document

30/08/1960

The year in which a vessel’s construction is completed.

Year of ship completion

1961

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Taikoo Dockyard & Engineering Co of Hong Kong Ltd

Unique identifier for a given ship, it is assigned by a builder.

Yard no

486

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Mch

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4b First Entry Report on Internal Combustion Machi

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

18/08/1960

Location where the document is written.

Location of Document Creation

Manchester

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See L A 4574

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Type and configuration of the engine(s) supplied for a vessel.

Engine type

6L3 Vertical Solid Injection Heavy Oil

Date in which construction of a vessel’s engines were completed.

Year of engine build

1960

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1960

Physical extent of a record.

Number of parts

2

Name of ship as recorded on the record

Ship name

Kurwina

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

14/03/1961

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

T S Woods

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hong Kong

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

327

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Lloyd\'s Agents 4574; Sheffield F75617; Sheffield F75533; Manchester C4031

The date of first visit by a surveyor.

Date of first survey

06/07/1960

Name of the individual/entity/organisation responsible for authoring the record

Document author

R J Yorston

Location where a vessel’s survey was undertaken.

Location of Survey

Patricroft

Date of the meeting of the Classing Committee.

Date of Classing committee

01/09/1961

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Patricroft

Engine builder as written

Lawrence Gardner & Sons

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1960