Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/11/1944
The year in which a vessel’s construction is completed.
1944
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
North Vancouver Ship Repairs Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
North Vancouver, British Columbia
The port in which a vessel is registered or permanently based.
Montreal
The individual and/or organisation listed
Canadian Government
Name of the individual/entity/organisation responsible for authoring the record
R J Sladden; Ernest L Jacobs
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Without Freeboard; Fitted for Oil Fuel 8,44; Flash Point above 150°F
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1944
Physical extent of a record.
1
Name of ship as recorded on the record
Richmond Park
The process of transferring a vessel to water, but not necessarily her completion.
16/06/1944
Unique identifier for a given ship, it is assigned by a builder.
144
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Class
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Park Steamship Co Ltd
Location where the document is written.
London
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7163
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1944
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.