Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/03/1964
The year in which a vessel’s construction is completed.
1964
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Kremer Sohn
Unique identifier for a given ship, it is assigned by a builder.
1102
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ham
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
1 First Entry Ship Report
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
03/02/1964
Name of the individual/entity/organisation responsible for authoring the record
Bruno Haar
Location where a vessel’s survey was undertaken.
Elmshorn
Date of the meeting of the Classing Committee.
27/04/1964
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1964
Physical extent of a record.
1
Name of ship as recorded on the record
Iwta Meghna
The process of transferring a vessel to water, but not necessarily her completion.
16/12/1963
Name of the shipbuilder as it appears on the record.
A V Jonas
The port or place in which the vessel’s construction took place, at the time of writing.
Elmshorn
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13424
The port in which a vessel is registered or permanently based.
Narayanganj
The date of first visit by a surveyor.
25/02/1963
The individual and/or organisation listed
East Pakistan Inland Water Transport Authority
Location where the document is written.
Hamburg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred for Gen Examination
Broad categories and subdivisions of vessels related to their purpose or function.
Ferry
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
182
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1964
Pertinent, useful or interesting recorded content.
Also refers to Vessels Iwta Gumti; Iwta Sitalakhya & Iwta Jamuna
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.