Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

07/05/1962

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

01/06/1963

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

G D Wilson

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Macvanska Mitrovica

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

731

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Rijeka 1891

The date of first visit by a surveyor.

Date of first survey

27/03/1962

The individual and/or organisation listed

Ship owner

East Pakistan Inland Water Transport Authority

Location where the document is written.

Location of Document Creation

Birmingham

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Rjka 1891

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Type and configuration of the engine(s) supplied for a vessel.

Engine type

C6/TFL Type

Date in which construction of a vessel’s engines were completed.

Year of engine build

1962

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1962

Physical extent of a record.

Number of parts

2

The year in which a vessel’s construction is completed.

Year of ship completion

1963

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Brodogradiliste 'Sava' Macvanska Mitrovica

Unique identifier for a given ship, it is assigned by a builder.

Yard no

97

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Bhm

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4b First Entry Report on Internal Combustion Machi

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

07/05/1962

Name of the individual/entity/organisation responsible for authoring the record

Document author

T E Larmont

Location where a vessel’s survey was undertaken.

Location of Survey

Shrewsbury

Date of the meeting of the Classing Committee.

Date of Classing committee

14/01/1964

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Shrewsbury

Engine builder as written

Rolls Royce Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1962

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.