Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

14/01/1948

The year in which a vessel’s construction is completed.

Year of ship completion

1949

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Aktiebolaget Gotaverken

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Gothenburg

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

18415

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

13/01/1948

Location where the document is written.

Location of Document Creation

Middlesbrough

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See F E Mchy Rpt

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tanker

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Draft

1948

Name of ship as recorded on the record

Ship name

Pericles

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

17/06/1949

Unique identifier for a given ship, it is assigned by a builder.

Yard no

630

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Mdb

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

5a Report on Boilers

The date of first visit by a surveyor.

Date of first survey

12/11/1947

Name of the individual/entity/organisation responsible for authoring the record

Document author

C Norman Stuart

Location where a vessel’s survey was undertaken.

Location of Survey

Stockton on Tees

Date of the meeting of the Classing Committee.

Date of Classing committee

18/11/1949

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document